Custom Link For Robert Price Difference For Size Change Order #1181

Gloryirondoors

Custom Link For Robert Price Difference For Size Change Order #1181

Sale price$2,380.00
Sold out
SKU: TED427

Buying Guide

 Glory Iron & Aluminum Door Buying Guide

Everything You Need to Know Before You Buy

At Glory Iron Doors, we know choosing the right door is more than just picking a style — it's about security, performance, design, and lasting value. Whether you're a homeowner, builder, or designer, this guide will walk you through the key considerations to help you make the best decision for your space.

 


1. Choose Your Door Type

We offer a variety of high-quality iron and aluminum doors to match different needs and aesthetics:

  • Wrought Iron Doors: Decorative, Timeless, durable, and elegant — perfect for front entryways.

  • Iron French Doors: Great for patios, interior transitions, and letting in natural light.

  • Iron Pivot Doors: A bold, modern choice with smooth, dramatic opening mechanisms.

  • Thermal Break Iron Doors: Ideal for extreme climates — enhanced insulation, energy efficiency, and comfort. Available for all door types. 

  • Aluminum Sliding & Bifold Doors: Sleek, space-saving, and great for indoor-outdoor living.

  •  Understand Thermal Break vs. Standard Doors

    • Thermal Break Doors: Feature insulation material inside the frame to prevent heat transfer. Ideal for hot and cold regions (e.g., NY, PA, MI, TX, CA). A bit more in price, but a smart choice for energy efficiency. 

    • Standard Doors: Great for mild climates or interior use.

    Tip: If you're in a climate with harsh summers or freezing winters, we highly recommend thermal break iron doors.


 2. Measure Your Opening

Before ordering, it’s important to measure:

  • Rough Opening Size                                                                                                    

    No matter whether you're purchasing an iron door or an aluminum door, it’s essential to confirm the rough opening size before placing your order.

    For aluminum doors, the unit size includes the entire door frame. Please ensure your rough opening is at least 1 inch wider and 1 inch taller than the total door unit size to allow proper fitting.

    For iron doors, each one is pre-hung, meaning the unit size already includes the jambs and threshold as part of the complete door system. So the rough opening size should be at least 1" wider and 1/2" taller than the door unit size. Pls confirm the door unit size and jamb size. 
    If you’re unsure about sizing for iron doors, please refer to our Iron Door Size Guide for assistance.

                                                                                                                     

 3. Select Your Style & Finish

From classic scrollwork to minimalist modern designs, we offer customizations to suit any taste:

  • Glass Finish Options: Clear, frosted, rain, low-E, and more.

  • Door Colors: Matte black, Oil Rubbed Bronze, etc, and custom colors.

  • Hardware: Handles with lock set to match your design vision.

  • Door Swing Direction: Every door can be opened in your way. 

    After you select all your door specifications, add the item to the cart and then go and submit the order directly. If you can not find the size or design that you want, pls feel free to reach out, we accept custom design and sizes. 

Once the order is confirmed, the drawing will be sent in 24-48 hours for approval before production. 


4. Consider Installation & Delivery

  • Once your door is ready to ship, we will arrange the truck shipment and provide you with the tracking number. We ship across the U.S. with secure, damage-resistant packaging.

  • Installation is straightforward for most contractors. We will send the installation guide before the door arrives. 


5. Still Have Questions?

Any concerns, feel free to contact us. We are always here to help you. Pls contact us at info@gloryirondoors.com or call us at 866-866-5020. 

Description
1. Extra Cost for Changing Size to 69x96 (adding two sidelights)


  • This is only for buyers to pay an extra shipping fee/price difference.
  • Kindly remind, this item is not a product.
  • Don't order this item without purchasing other products in our store.

This link for you to pay the price difference in the following situations:
1. When you already have placed an order, but you want to change it to a larger size

2. When you already have placed an order, but you want to change from standard iron door to thermal break iron door.

FAQ

Product

We do not provide the installation service for the moment, so you will need to find a local contractor or installer to install the door for you.

If you can not find your size listed in the size options, you can email us at info@gloryirondoors.com, and then we will check the price and make the custom link for you to place the order.

Yes, we accept custom designs and custom size. Pls contact us to get your quote.

All our iron doors are pre-hung and size will include the jambs and threshold, so we will recommend the door 1" smaller in width and 1/2" shorter than your rough opening, so that the door can fit in.

For example, if the door unit size will be 72x96, then pls leave the rough opening size 73x96.5.

Shipping

We ship our doors national wide. The doors will be free shipped to the whole continental US.

Our standard leadtime is 14-16 weeks since the drawing approval date. All our doors are handmade by our artisans, so it needs a reasonable long enough production time.

Yes, we ship to Canada.

Pls advise your detail shipping address, and then we will check the price with freight for you.