Custom Link For Sandra Reyes Price Difference For Size Change Order #1118
Custom Link For Sandra Reyes Price Difference For Size Change Order #1118

Gloryirondoors

Custom Link For Sandra Reyes Price Difference For Size Change Order #1118

Sale price$2,291.00
Sold out
SKU: PD102

Iron Door Buying Guide

Glory Iron Doors has been focusing on making the best quality wrought iron doors for our valued customers since 2001. We provide design inspirations and also accept custom design and custom sizes. 

Here are some information for you.

If you would like to get a door drawing from us, after confirming the door size and jamb size, you can choose the other iron door specs options, like door color, glass finish, handle and lock set , etc. And then send the options to us. Our technicians will make the drawing for you according the options. 

If you are not sure about the door size and jamb size,  you can refer to our iron door size guide.

If you are struggling with the iron door color, you can order an iron color sample to check first. 

Any concerns, feel free to contact us. We are always here to help you. Pls contact us at info@gloryirondoos.com. 

1. Extra Cost for Changing Size to 120x96 for Pivot Door
2. Extra Cost for Changing the Glass to Gray Tinted Glass for Front Door

  • This is only for buyers to pay an extra shipping fee/price difference.
  • Kindly remind, this item is not a product.
  • Don't order this item without purchasing other products in our store.

This link for you to pay the price difference in the following situations:
1. When you already have placed an order, but you want to change it to a larger size

2. When you already have placed an order, but you want to change from standard iron door to thermal break iron door.

FAQ

Product

We do not provide the installation service for the moment, so you will need to find a local contractor or installer to install the door for you.

If you can not find your size listed in the size options, you can email us at info@gloryirondoors.com, and then we will check the price and make the custom link for you to place the order.

Yes, we accept custom designs and custom size. Pls contact us to get your quote.

All our iron doors are pre-hung and size will include the jambs and threshold, so we will recommend the door 1" smaller in width and 1/2" shorter than your rough opening, so that the door can fit in.

For example, if the door unit size will be 72x96, then pls leave the rough opening size 73x96.5.

Shipping

We ship our doors national wide. The doors will be free shipped to the whole continental US.

Our standard leadtime is 14-16 weeks since the drawing approval date. All our doors are handmade by our artisans, so it needs a reasonable long enough production time.

Yes, we ship to Canada.

Pls advise your detail shipping address, and then we will check the price with freight for you.